Foam Wonderland

June, 2024

Stagehand


Assisted in the set up of LED wall and sound system for this event. Struck sound system after event.


Foam Wonderland setup 01 Foam Wonderland setup 02 Foam Wonderland setup 03 Foam Wonderland setup 04 Foam Wonderland setup 05 Foam Wonderland event

NTI24

May, 2024

LED Assist / Breakout Op / Lead


LED Wall Assembly:

Assembled a 13 x 9.7-foot LED wall using beMatrix LEDskin 2.5mm panels. Ran power and data lines for the wall, and replaced any defective modules. Wall used a NovaPro UHS Jr. processor and Brightsign XT4 video engine to manage the video display.


Booth PA System and Presentation Monitors:

Set up the booth's PA system with speakers, amplifiers, mixing boards, and microphones. Installed monitors for presentations. As the booth operator, performed daily checks and replacements of defective LED modules, mic’d presenters, and assisted with PowerPoint presentations. Struck the booth and prepared equipment for shipping with Freeman.


Crew Management:

Tracked assiting contractor's time, breaks, and schedule.


LED wall build for event booth, front view LED wall build for event booth, back view NTI24 event presentation

Gensys

May, 2024

LED 2 / Breakout Tech


Assisted in building a 3-wall setup using Roe Black Pearl v2 panels with Brompton Tessera SX40 processors and Tessera XD data distribution units. A six-person team assembled the large center wall, then split into two teams to complete the house's right and left walls. Led the team responsible for the house's right wall, managing the assembly and running power and data lines. After bringing the wall online, assisted in replacing damaged or non-functioning LED modules and troubleshooting panels with Novastar receiver cards.


Additionally, set up multiple breakout rooms with standard PA systems, screens, projectors, mics, and power strips.


Gensys LED wall assist 01 Gensys LED wall assist 02 Gensys LED wall assist 03 Gensys LED wall assist 04 Gensys LED wall assist 05 Gensys LED wall assist 06 Gensys LED wall assist 07 Gensys breakout room set

Danone

April, 2024

LED 2 / AVT


Originally brought on as an AV technician but then assigned to the LED wall assembly team. The Lead LED tech, with limited experience and unfamiliarity with Tessera processors, needed assistance. The infiled DB2.4 LED wall build faced technical challenges, including the lack of air or ground frames. Each section's bottom panel row was placed directly on the stage and zip-tied to an upright truss, causing alignment issues. Once the wall was built, power and data lines were run in a redundancy configuration. After connecting to two Tessera SX8 processors, some panels required power and data unit replacements. Despite initial difficulties bringing the wall online due to software crashes and data line issues, my solution involved starting with one processor before building in redundancy. Once the wall was online, defective modules were replaced.


Danone LED wall build 01 Danone LED wall build 02 Danone LED wall build 03 Danone LED wall build 04 Danone LED wall build 05 Danone LED wall build 06 Danone LED wall build 07

Mile High 420 Festival

April, 2024

LED Lead / IT Tech


LED Lead:

Led the assembly of an LED-walled DJ booth using older ROE MC 12H panels and a ROE Envision HD101 processor. Faced challenges due to the lack of original PC software for panel configuration, limiting adjustments to the processor's software. During the show, part of the wall went down, and processor settings couldn't fix it. Collaborated with the VJ and utilized Resolume software to successfully remap the wall.


IT Tech:

Contributed to setting up a Wi-Fi mesh network on-site, installed POS systems for all vendor booths, and provided troubleshooting support on the event day to ensure all vendors could process sales without issues.


MH 420 festival 01 MH 420 festival 02 MH 420 festival 03 MH 420 festival 04 MH 420 festival 05 MH 420 festival 06 MH 420 festival 07 MH 420 festival 08 MH 420 festival 09 MH 420 festival 10

GartnerAustin24

April, 2024

Steward / AVT Lead


After a previous positive working relationship with a UK based client, I was invited to Austin, TX, to lead a large multi-site, two-week-long event, managing up to 35 locally hired stagehands and AV technicians. The event, held twice for 700 and 500 attendees respectively, spanned multiple sites in Austin and multiple floors of the Fairmount Austin, with frequent event space changeovers.


Responsibilities included coordinating with various event companies to provide them with the assitance they required, communicating with the labor contractor, overseeing daily labor crews, handling schedule changes, addressing individual crew member issues, and working closely with the crew to ensure tasks were completed to the client's specifications.


Gartner Austin 2024 01 Gartner Austin 2024 02 Gartner Austin 2024 03 Gartner Austin 2024 04 Gartner Austin 2024 05 Gartner Austin 2024 06 Gartner Austin 2024 07 Gartner Austin 2024 08 Gartner Austin 2024 09 Gartner Austin 2024 10 Gartner Austin 2024 11 Gartner Austin 2024 12 Gartner Austin 2024 13 Gartner Austin 2024 14 Gartner Austin 2024 15 Gartner Austin 2024 16 Gartner Austin 2024 17 Gartner Austin 2024 18 Gartner Austin 2024 19 Gartner Austin 2024 20 Gartner Austin 2024 21 Gartner Austin 2024 22 Gartner Austin 2024 23 Gartner Austin 2024 24 Gartner Austin 2024 25 Gartner Austin 2024 26 Gartner Austin 2024 27 Gartner Austin 2024 28 Gartner Austin 2024 29 Gartner Austin 2024 30 Gartner Austin 2024 31 Gartner Austin 2024 32 Gartner Austin 2024 33 Gartner Austin 2024 34 Gartner Austin 2024 35 Gartner Austin 2024 36 Gartner Austin 2024 37 Gartner Austin 2024 38

WarSymposium_24

February, 2024

LED 2 / Lead


Assembled and connected power and data lines for two builds using LEDSkin panels and Novastar processors. The first build was a hanging 4-sided cube consisting of 100 panels. The second build involved 50 panels integrated into a beMatrix frame. Additionally, led the local crew for the project, ensuring efficient assembly and setup.


War Symposium LED build 01 War Symposium LED build 02 War Symposium LED build 03 War Symposium LED build 04 War Symposium LED build 05 War Symposium LED build 06 War Symposium LED build 07 War Symposium LED build 08

Zoetis

February, 2024

LED Assist / AVT


Assembled and ran power and data lines for a three-wall build using ROE CB5 panels, including 212 full panels and 46 half panels. The center wall was constructed on a ground frame, while the stage left and right walls were air frame builds. Assisted in other AVT setup tasks and struck other event spaces after show closing.


Zoetis LED wall build 01 Zoetis LED wall build 02 Zoetis LED wall build 03 Zoetis LED wall build 04 Zoetis LED wall build 05 Zoetis LED wall build 06 Zoetis LED wall build 07 Zoetis LED wall build 08 Zoetis LED wall build 09 Zoetis LED wall build 10 Zoetis LED wall build 11

LegacyInternational23

November, 23

Stagehand / Working Lead


Assembled LED wall and ran power and data lines for a four small wall stage build. Also set up lighting and audio for a live music event hosted in a secondary location onsite. Additionally, served as the lead for the local AVT crew.


Legacy International 23 01 Legacy International 23 02 Legacy International 23 03 Legacy International 23 04 Legacy International 23 05 Legacy International 23 06 Legacy International 23 07 Legacy International 23 08 Legacy International 23 09 Legacy International 23 10 Legacy International 23 11

SS_CO23

May, 2023

LED Hand


Assisted on two curved wall builds, marking a significant learning experience as my second assist on an LED wall project. Participated in the build and learned to wire power and data lines. Gained first-hand experience with processors, wall calibrations, and defective module replacements. Additionally, set up monitors and computers for the booth


SS CO23 01 SS CO23 02 SS CO23 03 SS CO23 04 SS CO23 05 SS CO23 06 SS CO23 07 SS CO23 08 SS CO23 09 SS CO23 10

TGGS2

March, 23

AVT / Working Lead


Assisted in building a massive 378 LED panel wall, marking the first experience with such a project. Additionally, managed the local AVT crew for the duration of the project.


TGGS2 LED wall build 01 TGGS2 LED wall build 02 TGGS2 LED wall build 03 TGGS2 LED wall build 04 TGGS2 LED wall build 05 TGGS2 LED wall build 06 TGGS2 LED wall build 07

Training

ROE Visual Displays

March, 2024

LED Technician Training


Completed a course covering best practices for installing, maintaining, and dismantling screens from the current lineup of ROE products. The training included the basic operation of Brompton and Megapixel processing systems. The course concluded with an examination, required for earning a ROE Tech Certification. Topics covered included: introduction to LED displays, physical build, cabling for data and power, processors and software, hands-on building sessions, color management, redundancy, media input, LED wall and cameras, GhostFrame frame remapping, and hands-on processor sessions.


ROE LED technician training 01 ROE LED technician training 02 ROE LED technician training 03 ROE LED technician training 04 ROE LED technician training 05 ROE LED technician training 06 ROE LED technician training 07 ROE LED technician training 08

Brompton Online Training

April, 2024

Brompton Processor Training


Attended Brompton Technology's online training, which covered the basics of setting up a processor to working with advanced features. The training included processor overview, pipeline overview, adding panels, groups and layers, OSD, redundancy, OSCA, Dark Magic, studio mode, low-end boost, updating firmware, presets, subfixtures, Tessera Software, frame remapping, and working with cameras. The training was attended online, providing a comprehensive understanding of Brompton's capabilities.


Brompton In-person Training

May, 2024

Brompton Processor Training


Completed a full day of Brompton Technology training, which covered the basics of setting up a processor to working with advanced features. The training included processor overview, pipeline overview, adding panels, groups and layers, OSD, redundancy, OSCA, Dark Magic, studio mode, low-end boost, updating firmware, presets, subfixtures, Tessera Software, frame remapping, and working with cameras. The training was attended in-person, which had hands-on processor sessions providing a comprehensive understanding of Brompton's capabilities.


Brompton processor training 01 Brompton processor training 02 Brompton processor training 03